{"id":43209,"date":"2021-09-20T11:49:00","date_gmt":"2021-09-20T11:49:00","guid":{"rendered":"https:\/\/kepner-tregoe.com\/about\/case-studies\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/"},"modified":"2025-08-13T20:10:12","modified_gmt":"2025-08-13T20:10:12","slug":"how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day","status":"publish","type":"client-success-story","link":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/","title":{"rendered":"How an International Architecture &#038; Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\" id=\"h-\"><\/h2>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-\"><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The nightmare begins. A scheduled IT upgrade over a weekend suddenly threatened to become a total IT system shutdown by Monday morning. Any IT outage that threatens to stop business operations is the kind of potential nightmare that keeps IT managers awake at night, but now it was actually happening.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The IT team at an international architecture and engineering firm had been planning the scheduled upgrade throughout the year. The plan included an entire core network upgrade (\u201crip and replace\u201d), server maintenance and a software upgrade that involved moving to a new vendor. The firm\u2019s IT infrastructure resides and is managed at headquarters and supports employees at offices in the US, Europe and the Caribbean.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The director of IT was remotely monitoring the project which was executed by two IT employees from his firm and the vendor. But when the work wasn\u2019t proceeding as expected and problems were mounting, the IT director headed in to join the team, concerned that systems would not be restored by start of business on Monday.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The director knew a total IT system shutdown could cost the company between $500,000 to $750,000 a day.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">IT is at the core of the company\u2019s workflow. The multiple locations rely on computer applications used by the architecture, engineering and construction teams. Work on the upgrade had begun on Friday with expected completion by Saturday afternoon. When the IT director arrived on Saturday, the team had encountered multiple problems and the servers were unable to connect to storage. Although the network was mostly stable, the primary server stack was not connecting to the data array, an absolutely vital resource for company personnel come Monday morning.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"684\" src=\"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/iStock-1145315815-1024x684.jpg\" alt=\"IT technicians discussing an issue\" class=\"wp-image-6674\" srcset=\"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/iStock-1145315815-1024x684.jpg 1024w, https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/iStock-1145315815-300x200.jpg 300w, https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/iStock-1145315815-768x513.jpg 768w, https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/iStock-1145315815-1536x1025.jpg 1536w, https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/iStock-1145315815-600x400.jpg 600w, https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/iStock-1145315815.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">It was immediately apparent that the new vendor was not approaching the problems systematically and had led the team in the wrong direction. The IT director and his senior architect had some experience using Kepner-Tregoe Problem Solving and Decision Making (PSDM) and had been through PSDM training. They decided to use the KT approach to regain control and find the best way forward. They initiated a war room and, using KT PSDM worksheets, brought in IT team members at remote locations so they could provide insights. Relying on his KT PSDM training and experience, the IT director knew that instead of reacting to the problems, his team and the vendor had to identify each problem methodically so they could understand them clearly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>As part of the initial Situation Appraisal, it was evident that the new vendor was overly focused on a problem that seemed to exist solely at headquarters with no issues at other locations. The KT methodology allowed them to identify this separate problem as an outlier.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Indeed they eventually learned that the area\u2019s fiber network had experienced a major outage that weekend that was totally unrelated to their existing IT problems. The team noted the issue but moved on to resolving the looming threat of a total IT shutdown. Focusing on the outlier issue of the local outage was adding unnecessary complexity and had distracted the team from its larger, more important task of resolving the multiple system problems that had arisen. By Monday, the team had worked through and resolved most of the problems, the network core and servers were stabilized and the system was back online.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The majority of the firm\u2019s IT staff now are certified in a KT PSDM program taught by the IT director who has become a certified KT Program Leader. Most of those trained are from the support staff that answer standard help-desk calls and work in the firm\u2019s U.S. locations. As their capabilities have grown, they have been able to serve the growing company without the need for additional IT support staff, generating savings in both problems solved and employee costs controlled.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The IT director is enthusiastic about KT\u2019s \u201ctrain-the-trainer\u201d approach, which is allowing him to train the entire IT staff as well as non-IT employees, and to serve as a facilitator for major issues. KT processes are now integrated into their ticketing system, helping problem solvers create a problem statement and improving escalations. When the integrated system was launched, problem escalations were dramatically reduced due to better communication and to the systematically organized information and data that drives resolution.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">KT PSDM gave me a foundation to be a successful problem solver\u2026 I am a huge advocate for KT because I\u2019ve seen it work so many times and in many situations.<br>\n\u2013Director of Information Technology<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">The value of KT PSDM during the threatened system upgrade will improve the way IT projects are done in the future. Not only did the KT methodology help identify and solve the problems during the upgrade, it is now used in planning future IT projects. In addition to avoiding a total outage and the significant costs of such a disruption, the IT team is confident in their ability to handle multiple, complex issues and to avoid future outages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00a0<\/p>\n","protected":false},"author":8,"featured_media":6662,"template":"","client-success-story-category":[274,278],"class_list":["post-43209","client-success-story","type-client-success-story","status-publish","has-post-thumbnail","hentry","client-success-story-category-construction","client-success-story-category-it-communication"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.7 (Yoast SEO v27.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How an International Architecture &amp; Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day - Kepner-Tregoe<\/title>\n<meta name=\"description\" content=\"The nightmare begins. A scheduled IT upgrade over a weekend suddenly threatened to become a total IT system shutdown by Monday morning. Any IT outage that\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How an International Architecture &amp; Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day\" \/>\n<meta property=\"og:description\" content=\"The nightmare begins. A scheduled IT upgrade over a weekend suddenly threatened to become a total IT system shutdown by Monday morning. Any IT outage that\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/\" \/>\n<meta property=\"og:site_name\" content=\"Kepner-Tregoe\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-13T20:10:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/28.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1340\" \/>\n\t<meta property=\"og:image:height\" content=\"520\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\\\/\",\"url\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\\\/\",\"name\":\"How an International Architecture & Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day - Kepner-Tregoe\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/28.jpg\",\"datePublished\":\"2021-09-20T11:49:00+00:00\",\"dateModified\":\"2025-08-13T20:10:12+00:00\",\"description\":\"The nightmare begins. A scheduled IT upgrade over a weekend suddenly threatened to become a total IT system shutdown by Monday morning. Any IT outage that\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\\\/#primaryimage\",\"url\":\"https:\\\/\\\/kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/28.jpg\",\"contentUrl\":\"https:\\\/\\\/kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/28.jpg\",\"width\":1340,\"height\":520},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Qui sommes nous?\",\"item\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\u00c9tudes de cas\",\"item\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/about\\\/client-success-stories\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"How an International Architecture &#038; Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/\",\"name\":\"Kepner-Tregoe\",\"description\":\"Problem solving &amp; critical thinking training\",\"publisher\":{\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/#organization\",\"name\":\"Kepner-Tregoe\",\"url\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/kepner-tregoe-logo.png\",\"contentUrl\":\"https:\\\/\\\/kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/kepner-tregoe-logo.png\",\"width\":264,\"height\":38,\"caption\":\"Kepner-Tregoe\"},\"image\":{\"@id\":\"https:\\\/\\\/kepner-tregoe.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/14495\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How an International Architecture & Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day - Kepner-Tregoe","description":"The nightmare begins. A scheduled IT upgrade over a weekend suddenly threatened to become a total IT system shutdown by Monday morning. Any IT outage that","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/","og_locale":"fr_FR","og_type":"article","og_title":"How an International Architecture & Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day","og_description":"The nightmare begins. A scheduled IT upgrade over a weekend suddenly threatened to become a total IT system shutdown by Monday morning. Any IT outage that","og_url":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/","og_site_name":"Kepner-Tregoe","article_modified_time":"2025-08-13T20:10:12+00:00","og_image":[{"width":1340,"height":520,"url":"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/28.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/","url":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/","name":"How an International Architecture & Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day - Kepner-Tregoe","isPartOf":{"@id":"https:\/\/kepner-tregoe.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/#primaryimage"},"image":{"@id":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/#primaryimage"},"thumbnailUrl":"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/28.jpg","datePublished":"2021-09-20T11:49:00+00:00","dateModified":"2025-08-13T20:10:12+00:00","description":"The nightmare begins. A scheduled IT upgrade over a weekend suddenly threatened to become a total IT system shutdown by Monday morning. Any IT outage that","breadcrumb":{"@id":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/#primaryimage","url":"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/28.jpg","contentUrl":"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/07\/28.jpg","width":1340,"height":520},{"@type":"BreadcrumbList","@id":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/how-an-international-architecture-engineering-firm-avoided-a-major-it-outage-saving-up-to-750000-per-day\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/kepner-tregoe.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Qui sommes nous?","item":"https:\/\/kepner-tregoe.com\/fr\/about\/"},{"@type":"ListItem","position":3,"name":"\u00c9tudes de cas","item":"https:\/\/kepner-tregoe.com\/fr\/about\/client-success-stories\/"},{"@type":"ListItem","position":4,"name":"How an International Architecture &#038; Engineering Firm Avoided a Major IT Outage, Saving Up To $750,000 per day"}]},{"@type":"WebSite","@id":"https:\/\/kepner-tregoe.com\/fr\/#website","url":"https:\/\/kepner-tregoe.com\/fr\/","name":"Kepner-Tregoe","description":"Problem solving &amp; critical thinking training","publisher":{"@id":"https:\/\/kepner-tregoe.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kepner-tregoe.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/kepner-tregoe.com\/fr\/#organization","name":"Kepner-Tregoe","url":"https:\/\/kepner-tregoe.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/kepner-tregoe.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/kepner-tregoe-logo.png","contentUrl":"https:\/\/kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/kepner-tregoe-logo.png","width":264,"height":38,"caption":"Kepner-Tregoe"},"image":{"@id":"https:\/\/kepner-tregoe.com\/fr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/14495"]}]}},"_links":{"self":[{"href":"https:\/\/kepner-tregoe.com\/fr\/wp-json\/wp\/v2\/client-success-story\/43209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kepner-tregoe.com\/fr\/wp-json\/wp\/v2\/client-success-story"}],"about":[{"href":"https:\/\/kepner-tregoe.com\/fr\/wp-json\/wp\/v2\/types\/client-success-story"}],"author":[{"embeddable":true,"href":"https:\/\/kepner-tregoe.com\/fr\/wp-json\/wp\/v2\/users\/8"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kepner-tregoe.com\/fr\/wp-json\/wp\/v2\/media\/6662"}],"wp:attachment":[{"href":"https:\/\/kepner-tregoe.com\/fr\/wp-json\/wp\/v2\/media?parent=43209"}],"wp:term":[{"taxonomy":"client-success-story-category","embeddable":true,"href":"https:\/\/kepner-tregoe.com\/fr\/wp-json\/wp\/v2\/client-success-story-category?post=43209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}